publicreporter.inpublicreporter.inpublicreporter.in
  • Home
  • City
  • State
  • National
  • international
  • Public
  • Readers
  • Blogger
  • Exclusive Report
Search
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
Reading: Mumbai–Pune Travel Set for a Major Transformation? Old Highway to Get Six Lanes as Expressway Expansion Plan Advances
Share
Notification Show More
Font ResizerAa
Font ResizerAa
publicreporter.inpublicreporter.in
  • Home
  • City
  • State
  • National
  • international
  • Public
  • Readers
  • Blogger
  • Exclusive Report
Search
  • Home
  • City
  • State
  • National
  • international
  • Public
  • Readers
  • Blogger
  • Exclusive Report
Have an existing account? Sign In
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
National

Mumbai–Pune Travel Set for a Major Transformation? Old Highway to Get Six Lanes as Expressway Expansion Plan Advances

Two major road expansion plans could reshape Maharashtra's busiest transport corridor.

PR Team
Last updated: 2026/11/10 at 3:37 AM
PR Team
Share
6 Min Read
SHARE

MSRDC initiates DPR process for widening the 110.8-km Nigdi–Shilphata stretch; estimated cost of ₹5,000–6,000 crore, while the existing expressway may be expanded to 10 lanes.

🔴 By | Sachin Dhumal

Mumbai and Pune, Maharashtra’s two major economic and industrial centres, could see a significant transformation in road connectivity. With rising vehicle numbers, expanding industrial corridors and increasing pressure on existing road infrastructure, the Maharashtra State Road Development Corporation (MSRDC) has initiated the process for widening the old Mumbai–Pune highway from four lanes to six lanes. The proposed project covers approximately 110.8 kilometres between Nigdi and Shilphata, bringing a fresh focus on the future of one of Maharashtra’s busiest transport corridors.

🟡 Old Mumbai–Pune Highway: ₹5,000–6,000 Crore Expansion Plan

The proposed widening concerns the old Mumbai–Pune highway, identified as National Highway 48 (NH-48), which connects important locations across Pune, Raigad and Thane districts. The route serves commuters, industrial establishments and commercial transport operators, with significant traffic movement around Lonavala, Khandala and Khopoli.

The estimated project cost is reportedly between ₹5,000 crore and ₹6,000 crore. However, this is a preliminary estimate and the final financial requirement will be established after the Detailed Project Report (DPR) is completed. MSRDC has initiated the process of appointing consultants to undertake the necessary studies, technical assessments and project planning. Different funding and implementation models, including public-private partnership arrangements, may also be examined.

🟡 Mumbai–Pune Expressway May Expand to 10 Lanes

Alongside the old highway widening proposal, a separate expansion plan is being considered for the Yashwantrao Chavan Mumbai–Pune Expressway. The existing six-lane expressway is proposed to be expanded to 10 lanes by adding four additional lanes, along with new tunnels and supporting infrastructure.

Another major development is the 13.3-kilometre Missing Link project, which was opened to traffic on May 1, 2026. The new route is expected to reduce travel time by approximately 25–30 minutes and ease congestion through the Lonavala–Khandala ghat section.

Together, these projects indicate a broader effort to improve road connectivity between Mumbai and Pune. However, the old highway widening and expressway expansion are separate projects and should not be confused.

🟡 Industrial Growth and Urban Expansion Add to Traffic Pressure

The Mumbai Metropolitan Region and Pune Metropolitan Region are experiencing continuous industrial, commercial and residential expansion. Industrial areas around Taloja, Patalganga and Khopoli, along with developing residential locations in the wider corridor, are contributing to increasing road traffic.

Improved road infrastructure could benefit logistics operations, industrial transportation and daily commuters. However, widening roads alone may not provide a lasting solution unless supporting infrastructure is developed simultaneously.

Service roads, safer junctions, pedestrian facilities, parking arrangements, accident management and better public transport connectivity will be equally important. Without integrated planning, even expanded highways could face congestion again within a few years.

🟡 Environmental Concerns in the Sahyadri Region

The proposed infrastructure expansion also raises important environmental questions, particularly in the ecologically sensitive Sahyadri mountain region.

Road widening around Lonavala and Khandala may require additional land, hill cutting and changes to existing drainage systems. These activities could affect forests, natural water channels and wildlife habitats if not carefully planned.

Environmental assessments, controlled construction practices, effective rainwater drainage and wildlife protection measures will therefore be essential. The challenge will be to improve connectivity without causing avoidable damage to the region’s natural environment.

🟡 Will Motorists Have to Pay Toll for Longer?

The financial model of the proposed highway expansion is another issue that deserves attention. Reports indicate that toll collection rights on the old highway currently extend until 2035. An extension of approximately 10–15 years has reportedly emerged as one of the options being examined to recover the proposed infrastructure investment.

However, no final decision on extending the toll collection period should be assumed at this stage. The final arrangement will depend on the project report, financial model and government approval. Any extension could have a direct impact on motorists who regularly use the Mumbai–Pune corridor.

🟡 A New Era for Mumbai–Pune Connectivity?

The proposed six-laning of the old highway and the possible 10-laning of the existing expressway represent two significant infrastructure developments for Maharashtra.

The projects could improve travel efficiency, strengthen industrial connectivity and support economic growth. But several questions remain unanswered: When will construction actually begin? What will be the final project cost? Will toll collection continue for an extended period? And how will the environmental impact be managed?

Ultimately, the future of Mumbai–Pune connectivity will depend not merely on the number of lanes added, but on the quality of planning, execution, safety measures and environmental safeguards.

Share this:

  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X

Like this:

Like Loading…
TAGGED: #MSRDC, Highway Expansion, Maharashtra Infrastructure, Missing Link, Mumbai Pune Expressway, Mumbai Pune Highway, NH48, Six Lane Highway, Ten Lane Expressway
Share This Article
Facebook Twitter Whatsapp Whatsapp Email Copy Link Print
Previous Article Delhi Pollution Update: AQI Crosses 400 After Diwali, GRAP-3 Implemented
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

235.3k Followers Like
69.1k Followers Follow
11.6k Followers Pin
56.4k Followers Follow
136k Subscribers Subscribe
4.4k Followers Follow
- Advertisement -
Ad imageAd image

Latest News

Delhi Pollution Update: AQI Crosses 400 After Diwali, GRAP-3 Implemented
National November 9, 2026
Mumbai NIA Court Sentences Doctor to 6 Years in ISIS Terror Case
City November 8, 2026
Abdul El-Sayed’s Indian Connection Goes Viral After US Senate Victory
international November 7, 2026
BMC’s ₹8,614 Crore Road Tender: Will Mumbai’s Past Mistakes Be Repeated?
City November 6, 2026
publicreporter.inpublicreporter.in
Follow US
© Website Design by Digital Buffalo - 9028927697
Welcome Back!

Sign in to your account

Lost your password?
%d